Conductor Bar System for Crane electrification
Conductor Bar System for Crane electrification
Conductor Bar System for Crane electrification
Downloads: 

Application
2 Process Bridge Cranes in a cement plant

Country
Czech Republic

City
Radotín

Representative office
Conductix-Wampfler s.r.o. [CZ]

Operator
Českomoravský cement, a.s.

Technical requirement[s]
Energy Transmission Systems for 2 Process Bridge Cranes

System course
Straight

Length [System]
155 m

Product[s]
Conductor Rail System, Program 0813 SinglePowerLine

Quantity of poles
3 + PE

Current
800 A

Voltage
400 V

Environmental condition(s)
Very high dust loading

Relevant Products

Single PowerLine 0813



  • Conductix-Wampfler
    Burlington

    1435 Norjohn Ct
    Unit #5
    Burlington, ON L7L 0E6
    Canada

    Phone: (+1) 800 667 2487 (Toll free)
    Fax: (+1) 450 951 8591

    vCard
    QR-Code
    How to find us